This is a new block with 1000 beds, built for medical college hospital, with latest technological advancement in the design, infrastructure and equipment.
Our scope of work was to provide the complete design on the scavenging pipeline systems including safe routing, equipment housing, outlet designing, end connection gadgets locations, space planning for the equipment layout and providing the operational procedures at all locations in the hospital.